How close can you get to the wall?

Introducing the FoW (Front of the Wall) system, designed to drill as close as possible.

CITILINK PILING has invested in a Soilmec SR-40FOW (Front of wall) in CFA mode with specially designed for the jobs where drilling as close as possible to existing buildings is required.

Have you ever been in a situation where your piles need to be drilled and poured right up against the wall in order to maximise the basement footprint?

With land value surging to new heights, more and more contractors are requested to drill the piles for new buildings right up against the wall.If you are faced with this challenge, and require further information, please email info@citilinkpiling.com.au.